Permit Strategy

Permit Strategy


Provide Building Department plan checkers with the information they need before they have to ask for it.

Reduce revision cycles by front-loading critical LUO code-compliance red flags such as ISA – Impermeable Surface Area, Building Area, and FAR – Floor Area Ratio calculations.

Include detailed survey information documenting existing and finished grade, topographic contours, and erosion control measures.

Service Request

Tell Us About Your Project